Field notes: the Tuesday the laydown area ate the pedestrian routeA site walk turns up a pedestrian route buried under three weeks of laydown creep, and the logistics drawing that never caught up.
16 Nov 2026
Mobile crane exclusion zone vs pedestrian exclusion zone: what's the difference?What separates a crane exclusion zone from a pedestrian exclusion zone on a construction site logistics plan, and why mixing them up causes close calls.
9 Nov 2026
How to segregate pedestrians from plant on a congested siteWhy pedestrian-plant segregation drifts on congested sites, and how to keep walkways and exclusion zones holding between walkarounds.
9 Nov 2026
What is a temporary works coordinator, and why logistics audits check for oneWhat a temporary works coordinator does, what the TW register should show, and what an overhead logistics audit can confirm about it.
2 Nov 2026
Field notes: the laydown area that grew three metres until the steel showed upA site logistics field note on laydown creep: how a steel order sitting in a queue can quietly eat the access route around it, week by week.
2 Nov 2026
What is a swept path analysis, and why your site logistics plan needs oneA plain-language look at swept path analysis for construction sites: what it checks, where it falls short once work starts, and what to do about it.
26 Oct 2026
How to check wheel-wash compliance on a muddy siteA practical checklist for checking wheel-wash compliance and mud-on-road enforcement risk on a wet, muddy construction site.
26 Oct 2026
What is a vehicle segregation plan, and why do HSE audits check it?What a vehicle segregation plan covers, and why HSE audits keep checking the gap between the plan and what's really on the ground.
19 Oct 2026
Field notes: the week the crane exclusion zone shrank by a skipA field-notes piece on how a crane exclusion zone shrinks by small, reasonable decisions, not one bad call, and why weekly overhead checks catch the drift.
19 Oct 2026
Toe board vs guardrail: what counts as compliant edge protectionToe boards and guardrails do different jobs under the Work at Height Regs. Here's what inspectors check, and the heights that matter.
14 Oct 2026
How to spot laydown area encroachment during a site walkA practical guide to catching laydown area encroachment on a site walk before it blocks access or breaches the logistics plan.
14 Oct 2026
What is a designated pedestrian route on a construction site?What counts as a designated pedestrian route, how segregation fails on live sites, and what to check for vehicle-pedestrian interface compliance.
13 Oct 2026
How to measure minimum access route width on a construction siteHow HSE managers measure minimum access route width on site, from swept path analysis to pedestrian/plant segregation checks.
13 Oct 2026
What counts as a blocked fire route on a construction siteA plain-English breakdown of what makes a fire route "blocked" on site, who's liable, and why laydown creep catches most HSE managers off guard.
8 Oct 2026
How to document a blocked access route for an HSE reportA practical rundown of what to capture when an access route gets blocked, so the report holds up and the CAR actually gets closed.
8 Oct 2026
Site logistics plan vs traffic management plan: what each one coversWhat a site logistics plan covers versus a traffic management plan, where the two overlap on a construction site, and why drift between them goes unnoticed.
8 Oct 2026
What height requires edge protection on a construction site?There's no single legal number. Here's how the 2m rule actually works, plus when edge protection is mandatory regardless of height.
8 Oct 2026
What is a banksman, and when does a site need one?What a banksman does, when HSE guidance expects one on site, and the layout checks construction audits look for.